HOW LONG DOES THE PROCESS TAKE?
The average job takes about 2 months to complete, from
the moment that the design has been decided until the final installation.
(see
process)
HOW MUCH DOES IT COST?
Ultimately the price depends on the complexity and size
of the project.
The complexity of a project is determined by different factors: the characteristics of the design, the number of colours included, if there is relief, if it is two or three dimensional, the number of firings required, and the total surface area and volume of the project. Depending on these elements, our projects are estimated between a minimum of $150 and a maximum of $400 per square foot (10 square feet minimum).